Not really. Although the water tower project is dormant from a practical point of view, plenty of planning and sourcing is still being done!
As of now, I am blueprinting electrical installations the proper wall anchoring solution for the half-way floor level. I am also keeping an eye on “Blocket” (the largest Swedish classifieds’ platform) for various items needed for the summer.
Can’t wait for spring to arrive though – I need an indoor temperature of above 5 degrees Celsius around the clock to be able to undertake crack fixing and plastering. Happy winter y’all!